Hampton Inn (Smithfield, NC)

Project Description

Project: Hampton Inn – Smithfield, NC
Client: Smithfield Hotel Investors LLC
Architect: The RBA Group, Inc.
Location: Smithfield, NC
Scope Analysis: The completed project consisted of the new construction of a 5-story, 64,154-sf, 112-guest room unit hotel building. The Hampton Inn – Smithfield project included all site work and site utilities, indoor pool, fitness room, meeting room, breakfast/pantry area, and outdoor space for hotel guests.

AC Marriott Erwin Terrace

Project Description

Project: AC Marriott Erwin Terrace
Client: RevPAR Companies
Architect: Nitin Kulkarni, AIA
Location: Durham, NC
Scope Analysis: The completed project consisted of the new construction of a 67,920-sf, 5-story hotel building with 142-guest room units. The site and building construction included all site work and site utilities, building concrete, asphalt paving, curb & gutter, masonry, structural steel, all architectural interior finishes, fire alarm, and MEP (mechanical, electrical, and plumbing) systems.

The Residence Inn Durham McPherson/Duke University

Project Description

Project: The Residence Inn Durham McPherson/Duke University
Client: Concord Hospitality
Architect: Braun & Steidl
Location: Durham, NC
Scope Analysis: The project consisted of the construction of a new Marriot Residence Inn as an addition to Downtown Durham and Duke University. The completed project consisted of 145-guest room units, communal space for guests, an indoor pool, and a ground-floor parking garage. The project construction required a block and plank construction build method. The adjoining building was considered historic since it was constructed in the 1920s.

Unscripted Hotel

Project Description

Project: Unscripted Hotel
Client: Austin Lawrence Partners
Architect: Private
Location: Durham, NC
Scope Analysis: The completed project consisted of the reposition of a 1960’s vintage hotel property formerly known as the “Jack Tar Hotel” into the new urban “Unscripted” brand. The completed project included ground-floor retail and a full-service high-end specialty restaurant. In addition to the hotel renovation, a garage renovation was completed. The property included a rooftop terrace “lounging pool” with a bar area.

Aloft Hotel at American Tobacco Campus

Project Description

Project: Aloft Hotel at American Tobacco Campus
Client: ATC East Development, LLC
Architect: Szostak Design
Location: Durham, NC
Scope Analysis: The project consisted of the new construction of a 104,397-sf, 6-story, 134-guest room unit hotel. The completed project included a boardroom, bar, 2nd-floor pool, and separate Presidents Club to service the Durham Performing Arts Center (DPAC). The project construction required a block and plank construction build method.

Hampton Inn Hotel (Kennesaw, GA)

Project Description

Project: Hampton Inn Hotel (Kennesaw, GA)
Client: GS Development
Architect: Private
Location: Kennesaw, GA
Scope Analysis: The project consisted of the construction of a new 62,800-sf, 7-story hotel with 100-guest room units. The completed project included an indoor pool and communal space for hotel guests.

Hyatt House – North Hills East (Raleigh, NC)

Project Description

Project: Hyatt House – North Hills East (Raleigh, NC)
Client: Concord Hospitality and Kane Reality
Architect: Private
Location: Raleigh, NC
Scope Analysis: The project consisted of the construction of a new Hyatt House with 137 guest suites, a separate office, and pool. The project construction required a block and plank construction build method.

Courtyard by Marriott (Alpharetta, GA)

Project Description

Project: Courtyard by Marriott
Client: Hotel Development Partners, LLC
Architect: Private
Location: Alpharetta, GA
Scope Analysis: The project consisted of the construction of a new 76,211-sf Courtyard by Marriott with 155-guest room units. The completed project included all site work, indoor pool, fitness room, lobby area, meeting rooms, and bar area.